Drainage and Utilities

Showing 56

Allow Design Scenarios to change proposed conduit properties and class based on depth of conduit.

The class of a pipe is primarily selected by the depth of cover over a pipe. Sometimes vehicle loads or construction loads have an influence on the class selection
about 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 1 Future consideration

Circular Eccentric Nodes should have the ability to have a rotation point at the center of the structure.

Circular eccentric nodes, like manholes, should have the ability to have a rotation point at the center of the structure and elevation reference at the center of the frame and cover.
11 months ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Provide a list of Outdated Cached References

If a drainage profile uses a cached view rather than a dynamic one, ORD will provide a notification in the bottom right-hand corner that simply says "Cached References are currently displayed. One or more cached references does not match the curre...
over 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Extend 2D profile terrain limits beyond element

The ability to extend a profile's terrain cut using the 2D quick profile tool would be helpful for all profile types - but specifically drainage. I'd like to be able to set a buffer distance that extends existing and proposed surface cuts beyond t...
over 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

ORD DU File Recovery Tools

ORD DU File recovery tools would be extremely handy when dealing with support issues. I've had to deal with a support ticket where the file is crashing upon opening several times now, and being able to run some tools outside of ORD would be extrem...
9 months ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 2 Future consideration

Connection Region in Bottom of Node

The current connection region of drainage nodes are available for the side faces of node only. The software should allow the connection region of pipe/conduit from the bottom of the node.
over 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

ORD Drainage - Separate CUlverts and Storm Sewer Pipes into Completely Separate Design Windows

Having to click 'Is Culvert' is just one more placve an error can take place in design. Creating spearate design windows for each of these elements will minimize this potential, and will make it easier for reviews as well.
over 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Ability to modify 'Rational Method Frequency Adjustment Factor' for a specific catchment or range of catchments.

Currently there is only an option to add Rational Method Frequency Adjustment Factors for the entire storm, which affects all catchments. Our GDOT standards require modification of the factor for only C values less than 0.6.
almost 2 years ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Drainage Structure Analyzer

Please include a tool similar to the Drainage Structure Analyzer from Inroads Storm and Sanitary. This tool is very useful for quick sizing without having to set up a model, especially with culverts and channels.
10 months ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Add reflect option for DU cells.

Implement a way to minimize the number of cells by allowing reflecting and mirroring of nodes during placement and manipulation.
over 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration