Currently, the only way to update Annotation is to update ALL or one drawing model at a time. It would be very helpful to be able to select a station range to remove and then update in one action.
| Civil Product Used | OpenRoads Designer, OpenRail Designer, OpenBridge Designer |
This really needs to be added to the next version of ORD. Allow the user to select a station range or build an event point list of select stations along a project to both remove drawing model annotations and reapply drawing model annotations. It is labor intensive to have to go into each drawing model to update annotations or remove all and apply all when custom labels have been added/formatted in drawing models that don't need to be removed to simply update a subset/station range within the total plan set.
Here is a macro that will accomplish this:
https://transystems365-my.sharepoint.com/:u:/g/personal/tjbrownlow_transystems_com/ERpODP0TKT9MnfqYTt_BNgoBhe08tFQk3O1eC6cWcWFtgg?e=7WTzkm
By named boundary, group of named boundaries, or selection set of named boundaries.