In the Release 2025 of OpenTunnel Designer we can add a unit at the start and at the end of a unit with a tunnel corridor but it is not possible to place this unit in the middle of it or adjust this with reopening the multi units created from an xml unit file. This actual process right now demands the recreation of the whole tunnel corridor.
| Civil Product Used | OpenTunnel Designer |