When I run a scenario and open the HEC-22 (Third Edition) Detailed Report or AASHTO Detailed Report, I don't see the most upstream node and the most downstream node of a storm sewer pipe run. One issue is the reports are based on conduits. Try making the reports based on nodes. The nodes at the beginning and end of the storm sewer pipe run will have some empty columns since they won't be applicable.
| Civil Product Used | OpenRoads Designer |