Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Applications

Showing 1370 of 1525

Add Conduit To Existing Profile Run

It would be very helpful if there was a way to simply Add a Conduit to an existing Profile Run. For example, I have a storm network modeled and a bunch of drawings created by using a Profile Run, but now I needed to add another conduit at the end ...
12 days ago in Drainage and Utilities / Drawing Production / OpenRail Designer / OpenRoads Designer 0 Future consideration

Use Analyze Point Tool in Sheet/Drawing Models

We need to be able to track alignment data to check sheet annotation. Would be very helpful to have an easy way to do this in sheets. Since an alignment or terrain would still need to be selected, the sheet scale shouldn't matter. This would work ...
almost 2 years ago in Analytics / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Allow the road slope to exceed the gutter cross slope

My state agency commonly uses gutters with a 4% cross slope. The maximum superelevation rate is 7%. The gutter slope stays at 4% in this situation. Spread does not compute in this scenario because "A depressed gutter must have a Gutter Cross Slope...

Warn users while detaching references whose labels are annotated in active file

civil labeler allows us to label civil geometry elements from reference files. Simply placing labels appears to apply the civil schema to the active dgn file.User like to have a warning when users detach reference files whose elements are labeled ...
about 2 months ago in OpenRail Designer / OpenRoads Designer / User Interface 0 Future consideration

Civil Labeler closes

We would appreciate an enhancement that keeps Civil Labeler open when switching files or models. If we are labeling cross sections, it closes every time we switch to every individual xsec model.
9 months ago in Annotation / OpenRail Designer / OpenRoads Designer / OpenSite Designer 1 Future consideration

Ability to annotate models over a station range

Currently, the only way to update Annotation is to update ALL or one drawing model at a time. It would be very helpful to be able to select a station range to remove and then update in one action.
over 2 years ago in Annotation / OpenBridge Designer / OpenBridge Modeler / OpenRail Designer / OpenRoads Designer 2 Future consideration

Rm Bridge: Use local axis for leading envelope displacements when local axis results are being reported

When reporting envelope .sup files, the leading value when reporting displacements is always global, while the results displayed are either local or gobal (selected by the user). This is inconvenient for displacement envelope result reporting when...
13 days ago in OpenBridge Designer 0 Future consideration

Add Elevations to the Event Point List Table

The elevations of the event point can only be seen when one generated a Horizontal Alignment Event Point List Report. It would be better also if the elevations can be seen earlier in the Event Points List Table
6 months ago in Geometry / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Inherit survey point name and code to regression point

When we import survey points into Survey and create a field book, we get the name and code for the point. However, if we want to use the survey points directly from the Field Book in Survey to use as regression points, we don't get the name and co...
3 months ago in OpenRail Designer / OpenRoads Designer / Regression Analysis 0 Future consideration

File Branding Interoperability - By Schema

File branding by Product is problematic for Organizations where multiple software solution are deployed like OpenSite, OpenRoads, OpenRail and OpenBridge. The schema(s) within the file should be analyzed at file open rather than the last authoring...