Cross section view should show Point name of a template drop

when using the point control function. It is expected to see the names of points of a template drop in the cross section view. This would be utilized when using the point control function.
almost 2 years ago in Drawing Production / OpenRail Designer / OpenRoads Designer / OpenSite Designer 4 Already exists

civil cell variables with expressions and variations

When we create parametric cells, we are able to use expressions to calculate values based on inputs, and in the properties of the cell, each of the variables (listed as visible) are shown, and you can adjust the cell from there. You can also creat...
over 1 year ago in Modeling / OpenRail Designer / OpenRoads Designer / OpenSite Designer 1 Future consideration

Make Grips Visible and Useable on 4k displays

When using Grips for Structures and Pipes - the grip blends too much into the background color, and on a 4K screen is TINY. The pipe grip is annoying to select (it only appears when I select the centerline of the pipe) but when adjusting or swapin...
10 months ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer / User Interface 1 Future consideration

Retaining turnouts when horizontal alignments are dropped.

Currently when an alignment is dropped (no longer complex) all associated turnouts delete entirely and any geomtery created from these turnoiuts is also deleted. This is a big issue when optioneering, or when working on a scheme with lots of turno...
almost 2 years ago in Geometry / OpenRail Designer 2 Future consideration

Turn feature definitions on/off in a reference

If feature definitions are turned off in a file, it doesn't show up when reference and it's not possible to even view without going back into the file. It would be helpful to have the option to turn on feature defintions the same way levels can be...
almost 2 years ago in OpenRail Designer / User Interface 2 Future consideration

Incorrect arc radius for turnout outer curve switch.

For turnout annotation, we need to add turnout with LLS Extension from the library. I know that it is possible to add LLS radius value for a defined curved turnout in the library, but for a complex project where there are a lot of curved turnouts ...
3 months ago in OpenRail Designer / Turnouts/Crossings 0

No subtraction of sleepers from ballast in corridor report

Corridor report does not subtract the volume of sleepers we added to the model from the ballast. I propose to add in the next version of ORD the possibility to subtract in the ballast the added sleepers.
3 months ago in OpenRail Designer / Reports 0 Future consideration

No possibility to set the lower limit height of the profile

When creating profiles using ,,Named Boundary”, I cannot set the lower height limit of the profile. I propose to add in the next part of ORD setting the lower height limit if we want to make one drawing sheet from profile. This would help with the...
3 months ago in Drawing Production / OpenRail Designer 1 Already exists

Openroads Drainage - HGL versus Headwater Analysis for Headwalls Inletting into a Storm Sewer System

Many times, a stream needs to be drained into a storm sewer system via a headwall. When this occurs, two analysis should be considered: The headwater at the headwall (the mechanics of the water getting into the pipe at the headwall). Generally KYT...
over 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

ORD Drainage - Show actual Tc versus Tc Minimum

Many times a calculated Time of Concentration is less than the minimum used for Intensity. When this occurs in a system of drainage areas (catchments), it helps a designer AND a reviewer to see what the actual Time of Concentration is at a given p...