We need that when writing down the singular points of a railway deviation (P0, P1, P2 and P3), they are joined by straight lines P1 with P2 and P0 with P3. See attached image. In fact, the V8i version did represent the detour scheme. Thank you!
Ability to have corridor/linear template pivot at end of alignment
Currently when developing a object that is at a skew, whether it be a road, bridge, culvert, or other detail modeling. If the start/end of the object is at a skew compared to the alignment that it is attached to, it is difficult to model. The user...
Add "Point" column to the table in the Corridor Objects-Point Control window to show which point is being controlled
As a Highway Designer I want the Corridor Objects-Point Control window to include a column in the table that shows which point is being controlled so that I can sort based on that point name to quickly determine which point controls applied to tha...
Our industry requires to provide accurate horizontal alignment's annotation which shows element's length between turnouts (not only length of whole plan elements). This is what could be done by "Switch Height Plan" tool in Power Rail Track (PRT). ...
Exported TIN surface must carry same edge method on importing.
Exported surface in TIN format not keeping the same edge method while importing it in new .dgn file. So, it is expected to get such functionality where the exported surface should carry the same edge method or while importing any surface it should...
Terrain label integrated with element template should able to rotate
The Element Template of the terrain are integrated with the Major /Minor Contour labelling and control by Text style for modification , This labelling is only in the orientation of the up Slope , and can not be rotate to down slope or control as p...
Create a better workflow for stacked cross sections. No need for complex seeds and dgnlibs. Just choose if we want to stack everything in a drawing model or in a sheet, how many rows and columns and hit enter.Maybe define the offsets and get a pre...
Ability to append, join, or combine individual alignments and have it hold the sub alignment stationing, which would create station equations
In Geopak, we had the ability to take individual alignments and create an overall alignment from a subset of alignments and it would hold the individual stationing for each alignment, creating station equations. There is no way to do this in ORD u...