Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Reports

Showing 5

Need a report (XSL) that combines Horizontal, Vertical, and cant information

Need a report (xsl) that combines Horizontal, Vertical, and cant information in it. Currently when the cant report (XML) is generated it also included horizontal geometry info (XSL). Similarly, when the horizontal report (XML) is generated it cont...
over 2 years ago in OpenRail Designer / Reports 2 Planned

Clearance Report

Rail industry needs to measure clearance of many elements relative to the track: linear and point. Not all can be done using 3D clash. Some exact value are sometime required by the standards. Typically measurement of a platform edge from the CL bu...
over 2 years ago in OpenRail Designer / Reports 2 Planned

List Points in Numerical Order When Generating Horizontal Point Report

Currently when generating a Horizontal point report, ORD does not list the points in numerical order. Say we have the points P1 through to P100, they should not be listed as P1, P10, P11, P12......P19, P2, P21 etc. seems it sorts by alphabetical o...
over 1 year ago in Geometry / OpenRail Designer / OpenRoads Designer / OpenSite Designer / Reports / Survey 1 Planned

Lift/Lower/Slue Report

Lift/Lower/Slue Report is missing and needs adding back in as we had in PowerRail Track
9 months ago in OpenRail Designer / Reports 0 Planned

horizontal reports for multiple alignments

Currently when only one rail alignment can be selected to output a horizontal report. Would be great if the ability to select multiple alignments and output a horizontal report at the same time. Reason: Currently have projects which contain multip...
over 1 year ago in Reports 0 Planned