Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

OpenRail Designer

Showing 32
163 VOTE

Drawing layout from right to left - plan and profile.

Fundamental convention for technical drawing demands that the north arrow point to the top of the page. Often an alignment either provided by a client or already exiting will progress from right to left. This being said, when creating plan and pro...
about 2 years ago in Drawing Production / Geometry / OpenRail Designer / OpenRoads Designer / OpenSite Designer 5 Planned

import parcels, survey chains, lines, curves, spirals from GPK

Since GEOPAK is no longer supported. I have heard from Bentley time and time again that we can get to our data out of the GPK and import it into ORD. BUT this is only true for chains, profiles and points. What about Parcels? survey chains? lines? ...
over 1 year ago in Import/Export / OpenRail Designer / OpenRoads Designer / OpenSite Designer 2 Planned

Import .xtr files without losing any data

We receive the rail alignment in the form of a .xtr file. In the file itself it is possible to see that there is station, cant, construction and destruction phase, and turnout information, yet when I import it in OpenRail Designer only the alignem...
almost 2 years ago in Import/Export / OpenRail Designer 7 Planned

Enhancement to Auto Update Field Codes on Point Features when Field Code on Linear Feature is Updated

If a user changes a linear feature code, the expectation would be to also see the feature codes on the points that make up that linear feature change accordingly (if the linear feature was dependent on these points features and the appropriate lin...
7 months ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Survey 0 Planned

Show the Link Size within the Link Summary Tab

The window that pops up after a hydraulic model run for design or analysis includes a "Calculation Detailed Summary". The Link Summary tab does not currently show the designed link size. Showing the link size in the Link Summary tab will allow the...

Update Extract from Graphic Order of Settings

In the Extract from Graphic tool, the conduit feature definition needs to be set prior to the node feature definition to pull the appropriate corresponding nodes from the workspace. Could the conduit feature definition settings be listed above the...

Need a report (XSL) that combines Horizontal, Vertical, and cant information

Need a report (xsl) that combines Horizontal, Vertical, and cant information in it. Currently when the cant report (XML) is generated it also included horizontal geometry info (XSL). Similarly, when the horizontal report (XML) is generated it cont...
about 2 years ago in OpenRail Designer / Reports 2 Planned

Clearance Report

Rail industry needs to measure clearance of many elements relative to the track: linear and point. Not all can be done using 3D clash. Some exact value are sometime required by the standards. Typically measurement of a platform edge from the CL bu...
about 2 years ago in OpenRail Designer / Reports 2 Planned

Automate Node labelling in Cross Section drawings

We need to be able to label nodes in cross sections drawings automatically. At the moment, this can only be done one node at a time, unlike conduits, which can be labeled automatically.

List Points in Numerical Order When Generating Horizontal Point Report

Currently when generating a Horizontal point report, ORD does not list the points in numerical order. Say we have the points P1 through to P100, they should not be listed as P1, P10, P11, P12......P19, P2, P21 etc. seems it sorts by alphabetical o...
about 1 year ago in Geometry / OpenRail Designer / OpenRoads Designer / OpenSite Designer / Reports / Survey 1 Planned