Flow Arrow from High to Low Point for any Civil/Linear Geometry

In placing drainage node to the carriageway or kerb/curb lines in 2D plan, it is useful to show the flow arrow from high point to low point for the drainage engineer. Currently, the flow arrow is only available in "Terrain", but not civil geometry...
over 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 1 Already exists

Ability to generate aggregated quantity report for all components linked to a price list

As a road designer, I would like to be able to produce a report aggregating all quantities for all components for a project, items in this reporting being linked to a price list.With Item types and Reports we have ability to generate data, but for...
almost 2 years ago in Item Types / OpenRail Designer / OpenRoads Designer / OpenSite Designer / Reports 0 Future consideration

Add surface to multiple drainage profiles quickly & in batch

I would like to be able to select multiple pipe profiles in the drainage and utilities tab and right click to add a surface to all of them at once. This will save a considerable amount of time - instead of needing to open each profile model indivi...
over 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

civil cell variables with expressions and variations

When we create parametric cells, we are able to use expressions to calculate values based on inputs, and in the properties of the cell, each of the variables (listed as visible) are shown, and you can adjust the cell from there. You can also creat...
over 1 year ago in Modeling / OpenRail Designer / OpenRoads Designer / OpenSite Designer 1 Future consideration

We need the ability to label the start and stop stations of a profile drawing model after the model is created.

Currently, the start and stop station text favorite values only exist at creation and are persisted to the drawing model. Therefore, they are not available after the drawing models are created.
3 months ago in Annotation / OpenRail Designer / OpenRoads Designer 0 Future consideration

Point Control lock to to start and lock to end option should honor the corridor start and end limits

Actually , the lock to start and lock to end stations are defined by the start and end of alignment or feature the corridor it is based on. This makes the point control handles (in the 2d view) to be outside the corridor limits when the corridor i...
almost 2 years ago in Modeling / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Dynamic Cross Section View should honor point control secondary alignments

I'd like temporary dimensions to report normal to secondary alignments
almost 2 years ago in Modeling / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Cross section view should show Point name of a template drop

when using the point control function. It is expected to see the names of points of a template drop in the cross section view. This would be utilized when using the point control function.
almost 2 years ago in Drawing Production / OpenRail Designer / OpenRoads Designer / OpenSite Designer 4 Already exists

Openroads Drainage - HGL versus Headwater Analysis for Headwalls Inletting into a Storm Sewer System

Many times, a stream needs to be drained into a storm sewer system via a headwall. When this occurs, two analysis should be considered: The headwater at the headwall (the mechanics of the water getting into the pipe at the headwall). Generally KYT...
over 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

ORD Drainage - Show actual Tc versus Tc Minimum

Many times a calculated Time of Concentration is less than the minimum used for Intensity. When this occurs in a system of drainage areas (catchments), it helps a designer AND a reviewer to see what the actual Time of Concentration is at a given p...
over 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration